Home page  |  Sitemap  |  Legal notice   |  Deutsche Version  Deutsche Version
About Lufttechnik  |  Automation  |  Service  |  Job offers  |  Downloads  |  Contact
You are here: > Home page > Paper industry
Papier Branchen  
Lebensmittel & Getränke Branchen  
Kunststoff & Chemie Branchen  
Metall Branchen  
Glasperlstrahlen  
Allgemeine Branchen  
 
Paper industry
Stock preparation . Paper machines . Equipment . Maintenance . Sound insulation . Auxiliary areas
 
 
Stock preparation
 
Ventilation or extraction systems are used for the removal of heat and humidity loads from stock preparation to protect the plant equipment and the building fabric.
Besides the hall air-conditioning, air-flow equipment is provided for the relevant process sections (grinders, refiners, presses, thickeners, pulpers, vats, disc filters, etc.). Control cabinets are kept at overpressure with specifically adapted ventilation to ensure that the electrical components do not come into contact with moisture.
Hazardous areas (e.g. chemical rooms) are fitted with ventilation equipment in accordance with official requirements.
  Skip to top
Continuous grinder exhausts
Extraction hood for flotation tanks
 
Paper machines
 
 
In the course of improving the performance of paper machines and their auxiliary plant, as well as for maintenance measures and stoppages, we carry out disassembly and re-assembly, maintenance and repair work.
We specialise particularly in service work on existing plant (fan overhauls / refurbishment of air duct systems / hood dryer conversions) and the planning, construction and assembly of new plant. Furthermore, we work frequently on the conversion and erection of new plant in the paper machine area with the paper machine manufacturers (Metso / Voith).
 
Wet end
Hall exhaust wire section /swing-out axial ventilator
Hall ventilation system in intermediate ceiling
Exhaust in wire area
  Skip to top
Dry end
Hall ventilation and extraction
Flap system ventilation tissue machine
Burner chamber for circulating-air drying coating machine
 
Equipment
 
Ventilation or extraction systems, as well as (edge trim) extraction systems for paper sheet transport, are used for the removal of heat and humidity loads from the equipment area.
In addition to the hall air-conditioning in the calender installation area, air-flow equipment is required for edge trim extraction at reel slitters and winders. Humidity measurement systems (e.g. Measurex or Parsytec frames) are kept at overpressure with specifically adapted ventilation to ensure that the electrical components do not come into contact with moisture.
Housing for reel slitter / dust extraction
  Skip to top
Double suction hood for edge trim extraction
Cooling for hygiene paper equipment
 
Maintenance / Repairs / Assembly
 
 
In the course of improving the performance of paper machines and their auxiliary plant, as well as for maintenance measures and stoppages, we carry out disassembly and re-assembly, maintenance and repair work.
We specialise particularly in service work on existing plant (fan overhauls / refurbishment of air duct systems / hood dryer conversions) and the planning, construction and assembly of new plant.
  Skip to top
 
 
Sound insulation
 
Planning, construction and assembly of sound absorbers, sound-insulating enclosures and sound-reducing capsules to reduce sound emissions.
Execution of the individual sound protection facilities in accordance with specific requirements (material, geometry, type, dimensions, air flow, absorber characteristic, cleaning, accessibility).
Implementation of sound measurements / preparation of sound redevelopment concepts.
  Skip to top
 
Auxiliary areas in the paper industry
 
 
Air-conditioning and ventilation systems also ensure good air conditions in the immediate surroundings of the paper production plant (sewage plant, kitchens, canteens, break rooms, changing rooms, workshops, laboratory rooms, control rooms, transformer rooms, hydraulics rooms, warehouses, administration buildings)
  Skip to top
 
































Your contacts

In urgent cases you can reach our emergency service outside normal business hours (Mon-Fri 7:00 am - 4:00 pm) at the following telephone numbers:

Refrigeration engineering emergency service:
0 800/ 26 22 112